Document Actions
Logistics systems simulation

Wind turbine tower

--
Treatment and coating of surfaces
Simulator
2007

In the year 2005 a company specialised in the surface treatment, installation of components and the logistic management of towers for wind turbines built a workshop of 3500 m2, which has a sandblasting cabin and two painting cabins for the process of surface treatment, these installations produced a capacity of 12 lengths per week.

In the year 2006 this company decided to expand their existing installations with the idea of duplicating the productive capacity of the installations. This necessity for expansion was repeated in 2007 and 2008.

 

Development of a support simulator for the planning of production which allows the personnel of the workshop to establish the best plan for specific established conditions like consumption and necessary resources to undertake the plan.

The simulator was developed with a tool to help decision taking that allows the user to study the different production alternatives and visualise the consequences of different production plans. This way the user can choose the best solution according to the conditions established by the production department.

This tool does not only allow an improvement in the control of production but also increases the efficiency of communication and setting objectives within the organisation.

Other tasks undertaken were:

  • A study of methods and times.
  • Elaboration of the 5S program.
  • Development of news handling systems.
  • Improvement of operations in the workshop through visual management.
Highlights
2012-04-26
Congreso Nacional de Medio Ambiente y Energías Renovables
Avilés, 25 a 27 de abril 2012.
2012-04-12
NAFEMS Iberia Seminar 2012
Numerical Methodologies and Modeling of Coupled Systems. May 10th 2012. Madrid, Spain
2012-04-12
Dos pymes gijonesas proyectan edificios modulares de 12 plantas
Fuente: La Nueva España
2012-03-21
INNPLANTA 2011
AST recibe financiación pública para la adquisición de equipamiento de simulación y ensayo para el Centro ENHCO.
2012-02-18
Adjudicada a AST la parcela Nº22 del PCTG
AST comenzará la construcción de su nuevo edificio en los próximos meses.
History